Equinix site staff have reported a utility power disturbance at the EU11.BCN datacenter, which resulted in an automatic transfer of all customer loads to generator power. All generators are operating normally, and the site currently has over 30 hours of fuel autonomy. The Equinix engineering team has confirmed that all loads remain stable with N+1 redundancy and is preparing to safely return to utility power.
At this time, all ITLDC services in BCN are fully operational, and there has been no impact on customer equipment.
Our team continues to monitor the situation together with Equinix staff and will provide updates if needed.
Status: No impact - operating on generator power